AgeCommit message (Collapse)AuthorFilesLines
2019-08-23Remove SSL Depending Testcases from Integration Test SuiteChristof Rabensteiner1-181/+0
- Reason: Now we can run integration tests without the need to set up SSL reverse proxy with client certificates.
2019-07-08Implement Zuse2App ServicesChristof Rabensteiner1-1/+1
- Add zuse2app.wsdl contract. - Add MsgResponse as an type-agnostic view for DeliveryRequestStatus and DeliveryNotification messages. Reason: Both DeliveryNotification and DeliveryRequestStatus messages have similar fields and need to be treated similarly (e.g.: receive from msg service, store to repository, verify signature, store to file...). In order to prevent duplicated code, the wrapper interface provides a type-agnostic view onto these messages for depending components to operate on. - Add MsgResponseHandler interface; decides how to process MsgResponse. Also implement this handler with a multi-threaded single-node implementation. - Add MsgResponseSink interface; decides how to archive MsgResponse. - Implement and test SafeResponseToFileSink. Change Identifier for MsgResponses: - Before, DeliveryRequestStatus and DeliveryNotifications had their own repositories. Now, both types are stored in the same repository (the MsgResponse repository) to streamline the handling of MsgResponses. We need to change the identification of MsgReponses, otherwise the identifiers (AppDeliveryID) clash. - MsgResponses are not identified by: <AppDeliveryId>+<typeSpecificSuffix> - Rewrite StoreSOAPInterceptor to accommodate fact that, both DeliveryRequestStatus and DeliveryNotification messages have different IDs upon storage / retrieval. Restructure packages and components as follows: - client: All components that are involved when consuming a web service. - process: "fabric" of MoaZS; contains business logic that orchestrates back-end tasks of MoaZS's operational services, e.g.: by processing a delivery request. - service: Implementation of MoaZS's front-end services. Refactoring: - MoaZSException: Remove unused fields. Before: Store mzsrequest, tnvzresult, msgrequest and msgresult as members. Now: Only keep the fields that are needed later, e.g for generating a msg:DeliveryRequestStatus element. Add copy constructor to Builder. - Put storage of byte[] into a dedicated "BinaryRepository". Reason: This was useful in a former design. Now it's not really needed anymore. - Put "create Endpoint" code into EndpointFactory. Reason: Eliminate duplicated code when configuring a service. Testing: - Activate Stacktraces in surefire.
2019-07-03Refactor: Restructure ProjectChristof Rabensteiner1-1/+1
- Move components that depend on the service contracts into scheme package. - Move cxf related components into util package. - Rename SameThread to SingleThreaded.
2019-07-02Implement And Integrate tnvz:QueryPersonRequest.Christof Rabensteiner1-14/+17
- Merge TnvzClient and TnvzResultVerifier to TnvzHelper; TnvzHelper now builds the QueryPersonRequest, sends it to the tnvz port and evaluates the result. - Publish some interfaces in Mzs2MsgConverter because they are needed by TnvzHelper. - Generalize MsgClientFactory to ClientFactory such that it can be used to generate arbitrary SOAP clients (e.g. also for tnvz!). Schema Changes to accomodate Tnvz's QueryPersonRequest: - Add optional tnvz:AustrianAddressesOnly and optional TnvzMetaData to mzs:mzs:DeliveryRequest. Removed Unit Tests: - Remove subset of SameThreadDeliveryPipeline testcases (mimetype related) because its logic moved to TnvzHelper.
2019-06-28Remove EgovUtils DependencyChristof Rabensteiner1-7/+0
- EgovUtils were needed because of DomUtils. Replace it with eaaf components' DomUtils. - Add test case to ensure SoapUtils still works as intended. - Remove unused import statement
2019-06-28Separate Test Suite into Unit- And Integration TestsChristof Rabensteiner1-0/+185
Per default, integration tests are excluded from build. They can be included with the `-P integration-test` argument. - Pom: Add maven profile for integration tests. - Rename integration tests (add `IT` prefix). - Move Resources into IT* folders. - Add MsgClientTest to test suite and add assertions to each test case.